ACT-126 / ITP / R00
Fire Extinguishers Installation — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Check hazard classification | — | — | — | — | — |
| Place accessible units | — | — | — | — | — |
| Verify inspection and labelling | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: approved extinguishers, brackets and signs
Inspection sequence
- Check hazard classification
- Place accessible units
- Verify inspection and labelling
Inspection controls
- Serial, type, inspection date and mounting height
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________