ACT-112 / CHK / R00
Water Pumps and Booster Sets — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Release base | — | — | — | — | — |
| Check manifold | — | — | — | — | — |
| Connect services and commission | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: booster skid, vessels, sensors and valves
Inspection points
- Release base
- Check manifold
- Connect services and commission
Records and release
- Approved settings, staging, duty and leaks
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________