Underground Drainage and Manholes — Inspection and Test Plan

Underground Drainage and ManholesPlumbing

ACT-111 / ITP / R00

Underground Drainage and Manholes — Inspection and Test Plan

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection and Test Plan worksheet
Inspection stageCriteria / clauseFrequencyResponsibilityIntervention pointEvidence
Release bedding—————
Install to surveyed inverts—————
Verify channels before backfill—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: underground pipes, bedding, chambers and covers

Inspection sequence

  • Release bedding
  • Install to surveyed inverts
  • Verify channels before backfill

Inspection controls

  • Level survey, cover class, CCTV or testing and backfill clearance
  • Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
  • Project review and approval: ____________________