ACT-094 / CHK / R00
Duct Leakage Testing — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Define test boundaries | — | — | — | — | — |
| Verify apparatus and isolation | — | — | — | — | — |
| Witness approved pressure and airflow readings | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: test rig, calibrated gauges and section caps
Inspection points
- Define test boundaries
- Verify apparatus and isolation
- Witness approved pressure and airflow readings
Records and release
- Duct class, area, calculated leakage and retest
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________