ACT-075 / CHK / R00
Ironmongery Installation — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Identify hardware by opening | — | — | — | — | — |
| Fit using approved templates | — | — | — | — | — |
| Coordinate keys and access control | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: scheduled hinges, locks, closers and templates
Inspection points
- Identify hardware by opening
- Fit using approved templates
- Coordinate keys and access control
Records and release
- Handing, finish, operation and key schedule
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________