ACT-070 / ITP / R00
Epoxy Flooring — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Check moisture and profile | — | — | — | — | — |
| Approve sample | — | — | — | — | — |
| Mix planned batches and protect cure | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: epoxy system, surface preparation and mixer
Inspection sequence
- Check moisture and profile
- Approve sample
- Mix planned batches and protect cure
Inspection controls
- Mix times, thickness, coverage and adhesion
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________