ACT-068 / ITP / R00
Internal Painting — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Approve sample | — | — | — | — | — |
| Prepare sound dry surfaces | — | — | — | — | — |
| Apply and protect coats | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: approved coatings, filler and preparation tools
Inspection sequence
- Approve sample
- Prepare sound dry surfaces
- Apply and protect coats
Inspection controls
- Batch, colour, application condition and defects
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________