ACT-066 / CHK / R00
Gypsum Board Partitions — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Set out partition | — | — | — | — | — |
| Inspect backing and services | — | — | — | — | — |
| Close approved fire/acoustic assembly | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: tracks, studs, boards, insulation and fasteners
Inspection points
- Set out partition
- Inspect backing and services
- Close approved fire/acoustic assembly
Records and release
- Board layers, screws, head detail and concealed photos
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________