ACT-063 / CHK / R00
Wall Tiling — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Release waterproofing | — | — | — | — | — |
| Agree coursing and cutouts | — | — | — | — | — |
| Set tile and seal interfaces | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: wall tiles, trims, adhesive and grout
Inspection points
- Release waterproofing
- Agree coursing and cutouts
- Set tile and seal interfaces
Records and release
- Plumb, alignment, wet transitions and penetrations
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________