ACT-059 / CHK / R00
Internal Plastering — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Release substrate | — | — | — | — | — |
| Set beads | — | — | — | — | — |
| Apply approved coats and cure | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: plaster, beads, mesh and guides
Inspection points
- Release substrate
- Set beads
- Apply approved coats and cure
Records and release
- Thickness, surface plane, corners and cracks
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________