ACT-057 / CHK / R00
Green Roof / Roof Finishes — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Release tested waterproofing | — | — | — | — | — |
| Place layers within design loading | — | — | — | — | — |
| Keep outlets accessible | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: root barrier, drainage cells, media and plants
Inspection points
- Release tested waterproofing
- Place layers within design loading
- Keep outlets accessible
Records and release
- Media depth, drainage continuity and planting handover
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________