ACT-047 / ITP / R00
Staircase Construction — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Set flights and landings | — | — | — | — | — |
| Coordinate nosings and starters | — | — | — | — | — |
| Release and pour | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: stair shutter, reinforcement and profile guides
Inspection sequence
- Set flights and landings
- Coordinate nosings and starters
- Release and pour
Inspection controls
- Rise, going, landings and edge protection
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________