Skip to content

Inspection and Test PlanACT-044-ITPR00Available

Concrete Repair Works — Inspection and Test Plan

Concrete Repair WorksStructural

ACT-044 / ITP / R00

Concrete Repair Works — Inspection and Test Plan

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection and Test Plan worksheet
Inspection stageCriteria / clauseFrequencyResponsibilityIntervention pointEvidence
Map defects—————
Agree repair class—————
Release substrate and cure repaired area—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: approved repair system and preparation tools

Inspection sequence

  • Map defects
  • Agree repair class
  • Release substrate and cure repaired area

Inspection controls

  • Depth and extent, materials and verification results
  • Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
  • Project review and approval: ____________________