ACT-043 / ITP / R00
Hollow Core Slab Installation — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Release supports | — | — | — | — | — |
| Confirm orientation | — | — | — | — | — |
| Coordinate joints and topping before loading | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: hollow-core units, bearings and grout
Inspection sequence
- Release supports
- Confirm orientation
- Coordinate joints and topping before loading
Inspection controls
- Seat lengths, unit damage and opening restrictions
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________