ACT-042 / CHK / R00
Precast Concrete Elements Installation — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Confirm support release | — | — | — | — | — |
| Erect by approved stability sequence | — | — | — | — | — |
| Secure permanent connections | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: marked precast units, bearings and bracing
Inspection points
- Confirm support release
- Erect by approved stability sequence
- Secure permanent connections
Records and release
- Piece marks, bearing length, restraint and connection evidence
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________