ACT-041 / ITP / R00
Post-Tensioned Slabs — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Release profiles and anchorages | — | — | — | — | — |
| Obtain concrete strength release | — | — | — | — | — |
| Witness specialist stressing and specified grouting | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: tendons, anchorages and calibrated stressing equipment
Inspection sequence
- Release profiles and anchorages
- Obtain concrete strength release
- Witness specialist stressing and specified grouting
Inspection controls
- Tendon IDs, elongation, jack calibration and closure evidence
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________