ACT-038 / ITP / R00
Hot Weather Concreting — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Confirm hot-weather controls | — | — | — | — | — |
| Schedule deliveries | — | — | — | — | — |
| Monitor and protect freshly placed concrete | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: temperature gauges, specified cooling and curing covers
Inspection sequence
- Confirm hot-weather controls
- Schedule deliveries
- Monitor and protect freshly placed concrete
Inspection controls
- Ambient and load temperature, elapsed time and rejection evidence
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________