Mass Concrete Pouring (Raft) — Inspection Checklist

Mass Concrete Pouring (Raft)Structural

ACT-036 / CHK / R00

Mass Concrete Pouring (Raft) — Inspection Checklist

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection Checklist worksheet
Inspection pointAcceptance referenceObservationPass / Fail / N/AEvidenceInspector / date
Release probe positions—————
Coordinate approved raft pour—————
Monitor thermal history during curing—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: concrete supply, probes and curing insulation

Inspection points

  • Release probe positions
  • Coordinate approved raft pour
  • Monitor thermal history during curing

Records and release

  • Probe IDs, temperature curves, approved limits and deviations
  • Record observed condition, acceptance reference, result and evidence for each item.
  • Inspector / witness / date / corrective action and reinspection: ____________________