ACT-036 / CHK / R00
Mass Concrete Pouring (Raft) — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Release probe positions | — | — | — | — | — |
| Coordinate approved raft pour | — | — | — | — | — |
| Monitor thermal history during curing | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: concrete supply, probes and curing insulation
Inspection points
- Release probe positions
- Coordinate approved raft pour
- Monitor thermal history during curing
Records and release
- Probe IDs, temperature curves, approved limits and deviations
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________