ACT-030 / CHK / R00
Formwork for Slabs and Beams — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Release supporting floors | — | — | — | — | — |
| Set soffit and beam profiles | — | — | — | — | — |
| Check access and openings | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: deck forms, shores, joists and edge forms
Inspection points
- Release supporting floors
- Set soffit and beam profiles
- Check access and openings
Records and release
- Camber, levels, support layout and opening protection
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________