ACT-014 / RA / R00
Excavation Works — Risk Assessment
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Task | Hazard and persons exposed | Initial risk | Controls | Owner | Residual risk |
|---|---|---|---|---|---|
| Locate utilities | — | — | — | — | — |
| Progress to approved depth and sequence | — | — | — | — | — |
| Inspect formation before preparing foundations | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: excavator, survey equipment and edge protection
Task risk review
- Locate utilities
- Progress to approved depth and sequence
- Inspect formation before preparing foundations
Assessment prompts
- Assess interfaces relevant to this location: Excavation edges, underground services and mobile plant.
- For each task identify hazards, persons exposed, initial rating, controls, responsible person and residual rating using the project risk matrix.
- Briefing / permit reference / competent reviewer / approval date: ____________________