ACT-009 / CHK / R00
Scaffolding Erection and Dismantling — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Release base | — | — | — | — | — |
| Follow approved scaffold design | — | — | — | — | — |
| Inspect and tag complete bays before use | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: standards, ledgers, decks, ties and tags
Inspection points
- Release base
- Follow approved scaffold design
- Inspect and tag complete bays before use
Records and release
- Ties, platforms, access and edge protection
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________