Skip to content

ChecklistACT-008-CHKR00Available

Mobile Crane Lifting Operations — Inspection Checklist

Mobile Crane Lifting OperationsProject Management

ACT-008 / CHK / R00

Mobile Crane Lifting Operations — Inspection Checklist

Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.

Inspection Checklist worksheet
Inspection pointAcceptance referenceObservationPass / Fail / N/AEvidenceInspector / date
Verify lifting plan and bearing assessment—————
Record configuration and setup—————
Witness authorised lift—————

Work identification

  • Project / area / grid: ____________________
  • Approved method, drawing and specification revisions: ____________________
  • Equipment and materials in scope: crane, mats, certified rigging and barriers

Inspection points

  • Verify lifting plan and bearing assessment
  • Record configuration and setup
  • Witness authorised lift

Records and release

  • Approved radius, rigging certificates and supervisor release
  • Record observed condition, acceptance reference, result and evidence for each item.
  • Inspector / witness / date / corrective action and reinspection: ____________________

Preview shown in full. The downloaded DOCX, XLSX and PDF are generated from this record.

Other documents for this activity

3