ACT-006 / ITP / R00
Tower Crane Installation, Climbing and Dismantling — Inspection and Test Plan
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection stage | Criteria / clause | Frequency | Responsibility | Intervention point | Evidence |
|---|---|---|---|---|---|
| Review supplier plan for each configuration | — | — | — | — | — |
| Record base and tie releases | — | — | — | — | — |
| Obtain specialist acceptance before operation | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: manufacturer-specified mast, ties and rigging
Inspection sequence
- Review supplier plan for each configuration
- Record base and tie releases
- Obtain specialist acceptance before operation
Inspection controls
- Configuration, tie checks, certificates and restrictions
- Enter the approved acceptance clause, inspection frequency, responsible party and hold or witness point for each stage.
- Project review and approval: ____________________