ACT-001 / CHK / R00
Site Mobilisation and Site Establishment — Inspection Checklist
Fictional demonstration project: SiteQuality Courtyard. Adapt to the approved project documents before use.
| Inspection point | Acceptance reference | Observation | Pass / Fail / N/A | Evidence | Inspector / date |
|---|---|---|---|---|---|
| Set out compound limits | — | — | — | — | — |
| Coordinate temporary services | — | — | — | — | — |
| Release access and welfare before occupation | — | — | — | — | — |
Work identification
- Project / area / grid: ____________________
- Approved method, drawing and specification revisions: ____________________
- Equipment and materials in scope: welfare units, barriers and access signage
Inspection points
- Set out compound limits
- Coordinate temporary services
- Release access and welfare before occupation
Records and release
- Compound plan, emergency access and utility releases
- Record observed condition, acceptance reference, result and evidence for each item.
- Inspector / witness / date / corrective action and reinspection: ____________________