Preliminaries & Enabling WorksActivities: 12
ACT-001

Site Mobilisation and Site Establishment

Project Management · Before Construction

Inspection covers compound plan, emergency access and utility releases.

4 available documentsMSCHKITP
ACT-002

Setting Out and Survey Works

Project Management · Before Construction

Inspection covers coordinates, survey closure and instrument calibration.

4 available documentsMSCHKITP
ACT-003

Site Hoarding and Gates Installation

Project Management · Before Construction

Inspection covers alignment, anchorage, gate swing and pedestrian segregation.

4 available documentsMSCHKITP
ACT-004

Temporary Site Offices and Facilities

Project Management · Before Construction

Inspection covers cabin IDs, bearing, exits and utility checks.

4 available documentsMSCHKITP
ACT-005

Temporary Power and Water Supply

Project Management · Before Construction

Inspection covers circuit IDs, isolation and backflow evidence.

4 available documentsMSCHKITP
ACT-006

Tower Crane Installation, Climbing and Dismantling

Project Management · Before Construction

Inspection covers configuration, tie checks, certificates and restrictions.

4 available documentsWIRMSITP
ACT-007

Passenger/Material Hoist Installation and Dismantling

Project Management · Before Construction

Inspection covers mast configuration, gate interlocks and rated load certificate.

4 available documentsMSCHKITP
ACT-008

Mobile Crane Lifting Operations

Project Management · Before Construction

Inspection covers approved radius, rigging certificates and supervisor release.

4 available documentsMSCHKITP
ACT-009

Scaffolding Erection and Dismantling

Project Management · Before Construction

Inspection covers ties, platforms, access and edge protection.

4 available documentsMSCHKITP
ACT-010

Temporary Works (Propping and Back-Propping)

Project Management · Before Construction

Inspection covers prop grid, retained levels, loads and removal authorisation.

4 available documentsMSCHKITP
ACT-011

Traffic Management and Site Logistics

Project Management · Before Construction

Inspection covers traffic plan, clearance walkdown and route changes.

4 available documentsMSCHKITP
ACT-012

Demobilisation and Site Clearance

Project Management · Before Construction

Inspection covers removal list, waste tickets and returned condition.

4 available documentsMSCHKITP
Earthworks & FoundationsActivities: 16
ACT-013

Site Clearance and Grubbing

Civil · During Construction

Inspection covers clearance boundary, retained assets and disposal tickets.

4 available documentsMSCHKITP
ACT-014

Excavation Works

Civil · During Construction

Inspection covers strata, levels, temporary stability and bearing release.

4 available documentsMSCHKITP
ACT-015

Shoring Works (Sheet Piles / Secant Piles / Contiguous Piles)

Civil · During Construction

Inspection covers toe levels, alignment and trigger/action monitoring.

4 available documentsMSCHKITP
ACT-016

Diaphragm Wall Construction

Civil · During Construction

Inspection covers depth, verticality, support-fluid properties and panel concrete volumes.

4 available documentsMSCHKITP
ACT-017

Dewatering Works

Civil · During Construction

Inspection covers water levels, discharge quality and shutdown release.

4 available documentsMSCHKITP
ACT-018

Bored Piling Works

Civil · During Construction

Inspection covers strata, depth, volume, pile ID and as-built survey.

4 available documentsMSCHKITP
ACT-019

Pile Load Testing (Static / Dynamic)

Civil · During Construction

Inspection covers load/displacement or dynamic trace, timestamps and engineer disposition.

4 available documentsMSCHKITP
ACT-020

Pile Integrity Testing

Civil · During Construction

Inspection covers pile ID, trace repeatability and report; no capacity inference.

5 available documentsTESTMSCHK
ACT-021

Pile Head Cutting and Trimming

Civil · During Construction

Inspection covers cut-off survey, exposed concrete and retained rebar.

4 available documentsMSCHKITP
ACT-022

Blinding Concrete

Civil · During Construction

Inspection covers thickness, level and release for next layer.

4 available documentsMSCHKITP
ACT-023

Below-Grade Waterproofing (Membrane)

Civil · During Construction

Inspection covers product compatibility, seam checks and concealed photographs.

4 available documentsMSCHKITP
ACT-024

Anti-Termite Treatment

Civil · During Construction

Inspection covers batch, coverage, treatment certificates and re-treatment areas.

4 available documentsMSCHKITP
ACT-025

Raft Foundation Construction

Civil · During Construction

Inspection covers cover, embed locations, concrete tests and raft survey.

4 available documentsMSCHKITP
ACT-026

Pile Caps and Grade Beams

Civil · During Construction

Inspection covers pile-to-cap detail, anchorage, cover and survey.

4 available documentsMSCHKITP
ACT-027

Backfilling and Compaction

Civil · During Construction

Inspection covers fill source, lift thickness, moisture, density and rework.

4 available documentsMSCHKITP
ACT-028

Soil Compaction Testing (Field Density Test)

Civil · During Construction

Inspection covers moisture, dry density, relative compaction and retests.

4 available documentsMSCHKITP
Concrete StructureActivities: 22
ACT-029

Formwork for Columns and Walls

Structural · During Construction

Inspection covers dimensions, plumb, cleanout and pre-pour approval.

4 available documentsMSCHKITP
ACT-030

Formwork for Slabs and Beams

Structural · During Construction

Inspection covers camber, levels, support layout and opening protection.

4 available documentsMSCHKITP
ACT-031

Core Wall Jump Form / Climbing Form System

Structural · During Construction

Inspection covers anchor IDs, platform release and cycle configuration.

4 available documentsMSCHKITP
ACT-032

Table Form / Flying Form System

Structural · During Construction

Inspection covers table ID, lifting points and receiving-bay survey.

4 available documentsMSCHKITP
ACT-033

Reinforcement Steel Fixing

Structural · During Construction

Inspection covers bar heat, grade, spacing, laps and cover.

4 available documentsMSCHKITP
ACT-034

Mechanical Couplers (Rebar Splicing)

Structural · During Construction

Inspection covers lot, engagement or torque, sample tests and concealment release.

4 available documentsMSCHKITP
ACT-035

Concrete Pouring (General)

Structural · During Construction

Inspection covers tickets, consistency, temperature, sample IDs and pour card.

4 available documentsWIRMSITP
ACT-036

Mass Concrete Pouring (Raft)

Structural · During Construction

Inspection covers probe IDs, temperature curves, approved limits and deviations.

4 available documentsMSCHKITP
ACT-037

Concrete Pumping Works

Structural · During Construction

Inspection covers line inspection, restraint, approved setup and washout disposal.

4 available documentsMSCHKITP
ACT-038

Hot Weather Concreting

Structural · During Construction

Inspection covers ambient and load temperature, elapsed time and rejection evidence.

4 available documentsMSCHKITP
ACT-039

Concrete Curing

Structural · During Construction

Inspection covers timing, coverage, interruptions and curing release.

4 available documentsMSCHKITP
ACT-040

Construction Joints and Waterstops

Structural · During Construction

Inspection covers location, splice integrity and photos on both faces.

4 available documentsMSCHKITP
ACT-041

Post-Tensioned Slabs

Structural · During Construction

Inspection covers tendon IDs, elongation, jack calibration and closure evidence.

4 available documentsMSCHKITP
ACT-042

Precast Concrete Elements Installation

Structural · During Construction

Inspection covers piece marks, bearing length, restraint and connection evidence.

4 available documentsMSCHKITP
ACT-043

Hollow Core Slab Installation

Structural · During Construction

Inspection covers seat lengths, unit damage and opening restrictions.

4 available documentsMSCHKITP
ACT-044

Concrete Repair Works

Structural · During Construction

Inspection covers depth and extent, materials and verification results.

4 available documentsMSCHKITP
ACT-045

Core Drilling and Coring Tests

Structural · During Construction

Inspection covers scan, orientation, custody, lab results and repair.

4 available documentsMSCHKITP
ACT-046

Embedded Items and Sleeves Installation

Structural · During Construction

Inspection covers coordinates, level, rotation and rebar clearance.

4 available documentsMSCHKITP
ACT-047

Staircase Construction

Structural · During Construction

Inspection covers rise, going, landings and edge protection.

4 available documentsMSCHKITP
ACT-048

Shear Walls and Lift Cores

Structural · During Construction

Inspection covers core verticality, shaft dimensions and embedded brackets.

4 available documentsMSCHKITP
ACT-049

Water Tanks (Concrete) Construction

Structural · During Construction

Inspection covers joint continuity, level observations and leak disposition.

4 available documentsMSCHKITP
ACT-050

Formwork Striking and Removal

Structural · During Construction

Inspection covers strength evidence, time, retained support and condition.

4 available documentsMSCHKITP
Structural Steel & RoofActivities: 7
Masonry & Architectural FinishesActivities: 24
ACT-058

Blockwork (Hollow / Solid / AAC)

Architectural · During Construction

Inspection covers block type, joints, plumb and lintel release.

4 available documentsMSCHKITP
ACT-059

Internal Plastering

Architectural · During Construction

Inspection covers thickness, surface plane, corners and cracks.

4 available documentsMSCHKITP
ACT-060

External Plastering / Rendering

Architectural · During Construction

Inspection covers weather record, mesh, terminations and appearance.

4 available documentsMSCHKITP
ACT-061

Floor Screeding

Architectural · During Construction

Inspection covers levels, moisture and thickness before finishes.

4 available documentsMSCHKITP
ACT-062

Floor Tiling (Ceramic / Porcelain)

Architectural · During Construction

Inspection covers shade, alignment, lippage and falls.

6 available documentsWIRMSRA
ACT-063

Wall Tiling

Architectural · During Construction

Inspection covers plumb, alignment, wet transitions and penetrations.

4 available documentsMSCHKITP
ACT-064

Marble and Granite Installation

Architectural · During Construction

Inspection covers slab marks, colour consistency, joints and support inspection.

4 available documentsMSCHKITP
ACT-065

Wet Area Waterproofing

Architectural · During Construction

Inspection covers coverage, collar detail, upstands and water test.

4 available documentsWIRMSITP
ACT-066

Gypsum Board Partitions

Architectural · During Construction

Inspection covers board layers, screws, head detail and concealed photos.

4 available documentsMSCHKITP
ACT-067

Gypsum Board / Mineral Fibre False Ceiling

Architectural · During Construction

Inspection covers plenum release, ceiling level, support spacing and access.

5 available documentsCLOSEOUTMSCHK
ACT-068

Internal Painting

Architectural · During Construction

Inspection covers batch, colour, application condition and defects.

4 available documentsMSCHKITP
ACT-069

External Painting

Architectural · During Construction

Inspection covers weather, coverage and finish consistency.

4 available documentsMSCHKITP
ACT-070

Epoxy Flooring

Architectural · During Construction

Inspection covers mix times, thickness, coverage and adhesion.

4 available documentsMSCHKITP
ACT-071

Raised Access Flooring

Architectural · During Construction

Inspection covers levels, rocking, cutout support and access.

4 available documentsMSCHKITP
ACT-072

Carpet and Vinyl Flooring

Architectural · During Construction

Inspection covers pattern continuity, seam quality, adhesion and edge finish.

4 available documentsMSCHKITP
ACT-073

Timber Doors Installation

Architectural · During Construction

Inspection covers clearances, leaf operation and finish.

4 available documentsMSCHKITP
ACT-074

Steel / Fire-Rated Doors Installation

Architectural · During Construction

Inspection covers label, gaps, closer, seal continuity and frame perimeter.

4 available documentsWIRMSITP
ACT-075

Ironmongery Installation

Architectural · During Construction

Inspection covers handing, finish, operation and key schedule.

4 available documentsMSCHKITP
ACT-076

Joinery and Fixed Furniture

Architectural · During Construction

Inspection covers level, finish, support and service access.

4 available documentsMSCHKITP
ACT-077

Kitchen Cabinets Installation

Architectural · During Construction

Inspection covers alignment, worktop bearing, cutouts and operation.

4 available documentsMSCHKITP
ACT-078

Sanitary Ware Installation

Architectural · During Construction

Inspection covers mounting height, stability, leakage and flow.

4 available documentsMSCHKITP
ACT-079

Handrails and Balustrades

Architectural · During Construction

Inspection covers height, gaps, alignment and specified load tests.

4 available documentsMSCHKITP
ACT-080

Expansion Joints and Fire-Stopping

Architectural · During Construction

Inspection covers tested assembly, depth, gap, lot and concealment photos.

4 available documentsMSCHKITP
ACT-081

Signage and Wayfinding

Architectural · During Construction

Inspection covers location, legibility, symbols and fixing.

4 available documentsMSCHKITP
Façade & Building EnvelopeActivities: 10
ACT-082

Curtain Wall System Installation

Architectural · During Construction

Inspection covers bracket settings, movement, drainage and water test.

4 available documentsMSCHKITP
ACT-083

Unitised Curtain Wall Installation

Architectural · During Construction

Inspection covers panel IDs, gasket engagement, survey and test evidence.

4 available documentsMSCHKITP
ACT-084

Aluminium Windows and Doors

Architectural · During Construction

Inspection covers anchorage, plumb, weeps and weather seals.

4 available documentsMSCHKITP
ACT-085

Glazing Works

Architectural · During Construction

Inspection covers unit locations, markings, edge condition and installation checks.

4 available documentsMSCHKITP
ACT-086

Aluminium Composite Panel (ACP) Cladding

Architectural · During Construction

Inspection covers identification, anchors, fire barriers and joint alignment.

4 available documentsMSCHKITP
ACT-087

Stone Cladding (Dry Fix)

Architectural · During Construction

Inspection covers stone batch, anchor tests, restraint and final survey.

4 available documentsMSCHKITP
ACT-088

GRC / GRP Panels Installation

Architectural · During Construction

Inspection covers panel condition, connection and seam evidence.

4 available documentsMSCHKITP
ACT-089

External Wall Insulation

Architectural · During Construction

Inspection covers thickness, fixings, gaps and concealment photos.

4 available documentsMSCHKITP
ACT-090

Façade Sealants and Water Testing

Architectural · During Construction

Inspection covers joint geometry, compatibility, leakage and retest.

5 available documentsTESTMSCHK
ACT-091

Building Maintenance Unit (BMU) Installation

Architectural · During Construction

Inspection covers track or anchors, machine IDs, load test and rescue plan.

4 available documentsMSCHKITP
HVAC (Mechanical)Activities: 16
ACT-092

Ductwork Fabrication and Installation

HVAC · During Construction

Inspection covers duct sizes, joints, clearances and leakage release.

4 available documentsMSCHKITP
ACT-093

Duct Insulation

HVAC · During Construction

Inspection covers thickness, jacket continuity and access.

4 available documentsMSCHKITP
ACT-094

Duct Leakage Testing

HVAC · During Construction

Inspection covers duct class, area, calculated leakage and retest.

5 available documentsTESTMSCHK
ACT-095

Chilled Water Piping Installation

HVAC · During Construction

Inspection covers joint traceability, slopes, supports and pressure release.

4 available documentsMSCHKITP
ACT-096

Chilled Water Pipe Insulation

HVAC · During Construction

Inspection covers thickness, seams, vapour continuity and thermal breaks.

4 available documentsMSCHKITP
ACT-097

Hydrostatic Pressure Testing of Piping

HVAC · During Construction

Inspection covers approved pressure and duration, gauge IDs, readings and leakage.

4 available documentsMSCHKITP
ACT-098

Chillers Installation

HVAC · During Construction

Inspection covers tag, mounts, alignment and commissioning results.

4 available documentsMSCHKITP
ACT-099

Cooling Towers Installation

HVAC · During Construction

Inspection covers basin leakage, alignment, fan and treatment handover.

4 available documentsMSCHKITP
ACT-100

AHU / FAHU Installation

HVAC · During Construction

Inspection covers nameplate, alignment, filters, drain fall and start-up evidence.

5 available documentsMIRMSCHK
ACT-101

FCU Installation

HVAC · During Construction

Inspection covers unit tag, filter access, drain flow and controls.

4 available documentsMSCHKITP
ACT-102

Pumps Installation (HVAC)

HVAC · During Construction

Inspection covers alignment, vibration, rotation and duty readings.

4 available documentsMSCHKITP
ACT-103

Ventilation and Exhaust Fans

HVAC · During Construction

Inspection covers airflow direction, rotation, guards and performance.

4 available documentsMSCHKITP
ACT-104

Grilles, Diffusers and Dampers

HVAC · During Construction

Inspection covers tags, actuator operation, airflow settings and access.

4 available documentsMSCHKITP
ACT-105

Kitchen Exhaust System

HVAC · During Construction

Inspection covers grease-tight joints, cleanout access, fire protection and fan duty.

4 available documentsMSCHKITP
ACT-106

Flushing and Chemical Cleaning of Pipes

HVAC · During Construction

Inspection covers chemical batch, circuit results, approved limits and effluent disposition.

4 available documentsMSCHKITP
ACT-107

Testing, Adjusting and Balancing (TAB)

HVAC · During Construction

Inspection covers design versus measured readings, settings, calibration and deviations.

5 available documentsTESTMSCHK
Plumbing & DrainageActivities: 11
ACT-108

Water Supply Piping (PPR / Copper / GI)

Plumbing · During Construction

Inspection covers material and joint logs, pressure test and disinfection release.

4 available documentsMSCHKITP
ACT-109

Drainage and Soil Piping (uPVC / HDPE / Cast Iron)

Plumbing · During Construction

Inspection covers invert levels, access and flow or water test.

4 available documentsMSCHKITP
ACT-110

Storm Water Drainage

Plumbing · During Construction

Inspection covers outlet ID, endpoint, ponding and leakage.

5 available documentsTESTMSCHK
ACT-111

Underground Drainage and Manholes

Plumbing · During Construction

Inspection covers level survey, cover class, CCTV or testing and backfill clearance.

4 available documentsMSCHKITP
ACT-112

Water Pumps and Booster Sets

Plumbing · During Construction

Inspection covers approved settings, staging, duty and leaks.

4 available documentsMSCHKITP
ACT-113

Water Tanks (GRP / Steel) Installation

Plumbing · During Construction

Inspection covers panel or weld checks, seals, retention and water approvals.

4 available documentsMSCHKITP
ACT-114

Water Heaters Installation

Plumbing · During Construction

Inspection covers tag, relief path, leakage and approved settings.

4 available documentsMSCHKITP
ACT-115

Grease Traps and Interceptors

Plumbing · During Construction

Inspection covers flow direction, cover rating, vents and leakage.

4 available documentsMSCHKITP
ACT-116

Pressure Testing of Water Piping

Plumbing · During Construction

Inspection covers medium, approved pressure and duration, readings and retest.

4 available documentsMSCHKITP
ACT-117

Drainage Water Test / Flow Test

Plumbing · During Construction

Inspection covers water head or flow, leakage, drain time and retest.

4 available documentsMSCHKITP
ACT-118

Disinfection and Flushing of Water System

Plumbing · During Construction

Inspection covers treatment record, sample ID, analytical results and service release.

4 available documentsMSCHKITP
Fire Protection & Life SafetyActivities: 9
ACT-119

Sprinkler System Installation

Firefighting · During Construction

Inspection covers head types and positions, support and pressure or flow evidence.

4 available documentsMSCHKITP
ACT-120

Fire Pumps Installation

Firefighting · During Construction

Inspection covers duty results, controller sequence and certificates.

4 available documentsMSCHKITP
ACT-121

Fire Hydrant and Hose Reel System

Firefighting · During Construction

Inspection covers signage, pressure and discharge readings, tag and accessories.

4 available documentsMSCHKITP
ACT-122

Wet / Dry Riser System

Firefighting · During Construction

Inspection covers floor labels, valve orientation and pressure test.

4 available documentsMSCHKITP
ACT-123

FM200 / Clean Agent System

Firefighting · During Construction

Inspection covers cylinder IDs, enclosure integrity, abort and alarms; no unauthorised discharge.

4 available documentsMSCHKITP
ACT-124

Fire Alarm System Installation

Firefighting · During Construction

Inspection covers device addresses, loop checks, annunciation and event records.

4 available documentsMSCHKITP
ACT-125

Smoke Management / Pressurisation System

Firefighting · During Construction

Inspection covers fan and damper states, differential pressure and witness evidence.

4 available documentsMSCHKITP
ACT-126

Fire Extinguishers Installation

Firefighting · During Construction

Inspection covers serial, type, inspection date and mounting height.

4 available documentsMSCHKITP
ACT-127

Fire Protection System Testing and Commissioning

Firefighting · During Construction

Inspection covers waterflow, alarm response, pressure readings and reinstatement.

4 available documentsMSCHKITP
ElectricalActivities: 17
ACT-128

Cable Trays and Trunking Installation

Electrical · During Construction

Inspection covers spans, clearances, bond continuity and fire compartments.

4 available documentsMSCHKITP
ACT-129

Conduit Installation (Concealed / Exposed)

Electrical · During Construction

Inspection covers routes, box levels, bends and conduit fill.

4 available documentsMSCHKITP
ACT-130

LV Cable Pulling and Termination

Electrical · During Construction

Inspection covers cable IDs, torque, insulation test and phase marking.

4 available documentsMSCHKITP
ACT-131

MV Cable Installation and Testing

Electrical · During Construction

Inspection covers drum lengths, pulling log and pre-energisation certificates.

4 available documentsMSCHKITP
ACT-132

Busduct Installation

Electrical · During Construction

Inspection covers section IDs, torque, clearance, continuity and insulation.

4 available documentsMSCHKITP
ACT-133

Transformers Installation

Electrical · During Construction

Inspection covers nameplate, earthing, protection and pre-service certificates.

4 available documentsMSCHKITP
ACT-134

MV / LV Switchgear and Panels Installation

Electrical · During Construction

Inspection covers tags, interlocks, torque, earthing and tests; not energisation authority.

4 available documentsWIRMSITP
ACT-135

Distribution Boards Installation

Electrical · During Construction

Inspection covers labels, phase balance, protection and circuit tests.

4 available documentsMSCHKITP
ACT-136

Diesel Generator Installation

Electrical · During Construction

Inspection covers transfer sequence, leak checks, load performance and noise.

4 available documentsMSCHKITP
ACT-137

UPS and Batteries Installation

Electrical · During Construction

Inspection covers battery lot, polarity verification, autonomy and alerts.

4 available documentsMSCHKITP
ACT-138

Lighting Fixtures Installation

Electrical · During Construction

Inspection covers circuit IDs, switching and light readings where required.

4 available documentsMSCHKITP
ACT-139

Wiring Devices (Sockets and Switches)

Electrical · During Construction

Inspection covers polarity, protection, labels and accessibility.

4 available documentsMSCHKITP
ACT-140

Earthing and Bonding System

Electrical · During Construction

Inspection covers electrode locations, continuity and resistance certificates.

4 available documentsMSCHKITP
ACT-141

Lightning Protection System

Electrical · During Construction

Inspection covers roof layout, bonded items and resistance results.

4 available documentsMSCHKITP
ACT-142

Emergency Lighting System

Electrical · During Construction

Inspection covers locations, duration, illumination and escape coverage.

4 available documentsMSCHKITP
ACT-143

Insulation Resistance (Megger) Testing

Electrical · During Construction

Inspection covers approved test voltage, conductor pairings and readings.

4 available documentsMSCHKITP
ACT-144

Electrical Testing and Commissioning

Electrical · During Construction

Inspection covers circuit and protection tests, interlocks and defects.

4 available documentsMSCHKITP
ELV & BMSActivities: 8
Vertical TransportationActivities: 4
External Works & InfrastructureActivities: 8
Testing, Commissioning & HandoverActivities: 6