75 activities matching “building”

Search the document library
Façade & Building EnvelopeActivities: 10
ACT-082

Curtain Wall System Installation

Architectural · During Construction

Inspection covers bracket settings, movement, drainage and water test.

4 available documentsMSCHKITP
ACT-083

Unitised Curtain Wall Installation

Architectural · During Construction

Inspection covers panel IDs, gasket engagement, survey and test evidence.

4 available documentsMSCHKITP
ACT-084

Aluminium Windows and Doors

Architectural · During Construction

Inspection covers anchorage, plumb, weeps and weather seals.

4 available documentsMSCHKITP
ACT-085

Glazing Works

Architectural · During Construction

Inspection covers unit locations, markings, edge condition and installation checks.

4 available documentsMSCHKITP
ACT-086

Aluminium Composite Panel (ACP) Cladding

Architectural · During Construction

Inspection covers identification, anchors, fire barriers and joint alignment.

4 available documentsMSCHKITP
ACT-087

Stone Cladding (Dry Fix)

Architectural · During Construction

Inspection covers stone batch, anchor tests, restraint and final survey.

4 available documentsMSCHKITP
ACT-088

GRC / GRP Panels Installation

Architectural · During Construction

Inspection covers panel condition, connection and seam evidence.

4 available documentsMSCHKITP
ACT-089

External Wall Insulation

Architectural · During Construction

Inspection covers thickness, fixings, gaps and concealment photos.

4 available documentsMSCHKITP
ACT-090

Façade Sealants and Water Testing

Architectural · During Construction

Inspection covers joint geometry, compatibility, leakage and retest.

5 available documentsTESTMSCHK
ACT-091

Building Maintenance Unit (BMU) Installation

Architectural · During Construction

Inspection covers track or anchors, machine IDs, load test and rescue plan.

4 available documentsMSCHKITP
HVAC (Mechanical)Activities: 16
ACT-092

Ductwork Fabrication and Installation

HVAC · During Construction

Inspection covers duct sizes, joints, clearances and leakage release.

4 available documentsMSCHKITP
ACT-093

Duct Insulation

HVAC · During Construction

Inspection covers thickness, jacket continuity and access.

4 available documentsMSCHKITP
ACT-094

Duct Leakage Testing

HVAC · During Construction

Inspection covers duct class, area, calculated leakage and retest.

5 available documentsTESTMSCHK
ACT-095

Chilled Water Piping Installation

HVAC · During Construction

Inspection covers joint traceability, slopes, supports and pressure release.

4 available documentsMSCHKITP
ACT-096

Chilled Water Pipe Insulation

HVAC · During Construction

Inspection covers thickness, seams, vapour continuity and thermal breaks.

4 available documentsMSCHKITP
ACT-097

Hydrostatic Pressure Testing of Piping

HVAC · During Construction

Inspection covers approved pressure and duration, gauge IDs, readings and leakage.

4 available documentsMSCHKITP
ACT-098

Chillers Installation

HVAC · During Construction

Inspection covers tag, mounts, alignment and commissioning results.

4 available documentsMSCHKITP
ACT-099

Cooling Towers Installation

HVAC · During Construction

Inspection covers basin leakage, alignment, fan and treatment handover.

4 available documentsMSCHKITP
ACT-100

AHU / FAHU Installation

HVAC · During Construction

Inspection covers nameplate, alignment, filters, drain fall and start-up evidence.

5 available documentsMIRMSCHK
ACT-101

FCU Installation

HVAC · During Construction

Inspection covers unit tag, filter access, drain flow and controls.

4 available documentsMSCHKITP
ACT-102

Pumps Installation (HVAC)

HVAC · During Construction

Inspection covers alignment, vibration, rotation and duty readings.

4 available documentsMSCHKITP
ACT-103

Ventilation and Exhaust Fans

HVAC · During Construction

Inspection covers airflow direction, rotation, guards and performance.

4 available documentsMSCHKITP
ACT-104

Grilles, Diffusers and Dampers

HVAC · During Construction

Inspection covers tags, actuator operation, airflow settings and access.

4 available documentsMSCHKITP
ACT-105

Kitchen Exhaust System

HVAC · During Construction

Inspection covers grease-tight joints, cleanout access, fire protection and fan duty.

4 available documentsMSCHKITP
ACT-106

Flushing and Chemical Cleaning of Pipes

HVAC · During Construction

Inspection covers chemical batch, circuit results, approved limits and effluent disposition.

4 available documentsMSCHKITP
ACT-107

Testing, Adjusting and Balancing (TAB)

HVAC · During Construction

Inspection covers design versus measured readings, settings, calibration and deviations.

5 available documentsTESTMSCHK
Plumbing & DrainageActivities: 11
ACT-108

Water Supply Piping (PPR / Copper / GI)

Plumbing · During Construction

Inspection covers material and joint logs, pressure test and disinfection release.

4 available documentsMSCHKITP
ACT-109

Drainage and Soil Piping (uPVC / HDPE / Cast Iron)

Plumbing · During Construction

Inspection covers invert levels, access and flow or water test.

4 available documentsMSCHKITP
ACT-110

Storm Water Drainage

Plumbing · During Construction

Inspection covers outlet ID, endpoint, ponding and leakage.

5 available documentsTESTMSCHK
ACT-111

Underground Drainage and Manholes

Plumbing · During Construction

Inspection covers level survey, cover class, CCTV or testing and backfill clearance.

4 available documentsMSCHKITP
ACT-112

Water Pumps and Booster Sets

Plumbing · During Construction

Inspection covers approved settings, staging, duty and leaks.

4 available documentsMSCHKITP
ACT-113

Water Tanks (GRP / Steel) Installation

Plumbing · During Construction

Inspection covers panel or weld checks, seals, retention and water approvals.

4 available documentsMSCHKITP
ACT-114

Water Heaters Installation

Plumbing · During Construction

Inspection covers tag, relief path, leakage and approved settings.

4 available documentsMSCHKITP
ACT-115

Grease Traps and Interceptors

Plumbing · During Construction

Inspection covers flow direction, cover rating, vents and leakage.

4 available documentsMSCHKITP
ACT-116

Pressure Testing of Water Piping

Plumbing · During Construction

Inspection covers medium, approved pressure and duration, readings and retest.

4 available documentsMSCHKITP
ACT-117

Drainage Water Test / Flow Test

Plumbing · During Construction

Inspection covers water head or flow, leakage, drain time and retest.

4 available documentsMSCHKITP
ACT-118

Disinfection and Flushing of Water System

Plumbing · During Construction

Inspection covers treatment record, sample ID, analytical results and service release.

4 available documentsMSCHKITP
Fire Protection & Life SafetyActivities: 9
ACT-119

Sprinkler System Installation

Firefighting · During Construction

Inspection covers head types and positions, support and pressure or flow evidence.

4 available documentsMSCHKITP
ACT-120

Fire Pumps Installation

Firefighting · During Construction

Inspection covers duty results, controller sequence and certificates.

4 available documentsMSCHKITP
ACT-121

Fire Hydrant and Hose Reel System

Firefighting · During Construction

Inspection covers signage, pressure and discharge readings, tag and accessories.

4 available documentsMSCHKITP
ACT-122

Wet / Dry Riser System

Firefighting · During Construction

Inspection covers floor labels, valve orientation and pressure test.

4 available documentsMSCHKITP
ACT-123

FM200 / Clean Agent System

Firefighting · During Construction

Inspection covers cylinder IDs, enclosure integrity, abort and alarms; no unauthorised discharge.

4 available documentsMSCHKITP
ACT-124

Fire Alarm System Installation

Firefighting · During Construction

Inspection covers device addresses, loop checks, annunciation and event records.

4 available documentsMSCHKITP
ACT-125

Smoke Management / Pressurisation System

Firefighting · During Construction

Inspection covers fan and damper states, differential pressure and witness evidence.

4 available documentsMSCHKITP
ACT-126

Fire Extinguishers Installation

Firefighting · During Construction

Inspection covers serial, type, inspection date and mounting height.

4 available documentsMSCHKITP
ACT-127

Fire Protection System Testing and Commissioning

Firefighting · During Construction

Inspection covers waterflow, alarm response, pressure readings and reinstatement.

4 available documentsMSCHKITP
ElectricalActivities: 17
ACT-128

Cable Trays and Trunking Installation

Electrical · During Construction

Inspection covers spans, clearances, bond continuity and fire compartments.

4 available documentsMSCHKITP
ACT-129

Conduit Installation (Concealed / Exposed)

Electrical · During Construction

Inspection covers routes, box levels, bends and conduit fill.

4 available documentsMSCHKITP
ACT-130

LV Cable Pulling and Termination

Electrical · During Construction

Inspection covers cable IDs, torque, insulation test and phase marking.

4 available documentsMSCHKITP
ACT-131

MV Cable Installation and Testing

Electrical · During Construction

Inspection covers drum lengths, pulling log and pre-energisation certificates.

4 available documentsMSCHKITP
ACT-132

Busduct Installation

Electrical · During Construction

Inspection covers section IDs, torque, clearance, continuity and insulation.

4 available documentsMSCHKITP
ACT-133

Transformers Installation

Electrical · During Construction

Inspection covers nameplate, earthing, protection and pre-service certificates.

4 available documentsMSCHKITP
ACT-134

MV / LV Switchgear and Panels Installation

Electrical · During Construction

Inspection covers tags, interlocks, torque, earthing and tests; not energisation authority.

4 available documentsWIRMSITP
ACT-135

Distribution Boards Installation

Electrical · During Construction

Inspection covers labels, phase balance, protection and circuit tests.

4 available documentsMSCHKITP
ACT-136

Diesel Generator Installation

Electrical · During Construction

Inspection covers transfer sequence, leak checks, load performance and noise.

4 available documentsMSCHKITP
ACT-137

UPS and Batteries Installation

Electrical · During Construction

Inspection covers battery lot, polarity verification, autonomy and alerts.

4 available documentsMSCHKITP
ACT-138

Lighting Fixtures Installation

Electrical · During Construction

Inspection covers circuit IDs, switching and light readings where required.

4 available documentsMSCHKITP
ACT-139

Wiring Devices (Sockets and Switches)

Electrical · During Construction

Inspection covers polarity, protection, labels and accessibility.

4 available documentsMSCHKITP
ACT-140

Earthing and Bonding System

Electrical · During Construction

Inspection covers electrode locations, continuity and resistance certificates.

4 available documentsMSCHKITP
ACT-141

Lightning Protection System

Electrical · During Construction

Inspection covers roof layout, bonded items and resistance results.

4 available documentsMSCHKITP
ACT-142

Emergency Lighting System

Electrical · During Construction

Inspection covers locations, duration, illumination and escape coverage.

4 available documentsMSCHKITP
ACT-143

Insulation Resistance (Megger) Testing

Electrical · During Construction

Inspection covers approved test voltage, conductor pairings and readings.

4 available documentsMSCHKITP
ACT-144

Electrical Testing and Commissioning

Electrical · During Construction

Inspection covers circuit and protection tests, interlocks and defects.

4 available documentsMSCHKITP