22 activities matching “Concrete Structure”

Search the document library
Concrete StructureActivities: 22
ACT-029

Formwork for Columns and Walls

Structural · During Construction

Inspection covers dimensions, plumb, cleanout and pre-pour approval.

4 available documentsMSCHKITP
ACT-030

Formwork for Slabs and Beams

Structural · During Construction

Inspection covers camber, levels, support layout and opening protection.

4 available documentsMSCHKITP
ACT-031

Core Wall Jump Form / Climbing Form System

Structural · During Construction

Inspection covers anchor IDs, platform release and cycle configuration.

4 available documentsMSCHKITP
ACT-032

Table Form / Flying Form System

Structural · During Construction

Inspection covers table ID, lifting points and receiving-bay survey.

4 available documentsMSCHKITP
ACT-033

Reinforcement Steel Fixing

Structural · During Construction

Inspection covers bar heat, grade, spacing, laps and cover.

4 available documentsMSCHKITP
ACT-034

Mechanical Couplers (Rebar Splicing)

Structural · During Construction

Inspection covers lot, engagement or torque, sample tests and concealment release.

4 available documentsMSCHKITP
ACT-035

Concrete Pouring (General)

Structural · During Construction

Inspection covers tickets, consistency, temperature, sample IDs and pour card.

4 available documentsWIRMSITP
ACT-036

Mass Concrete Pouring (Raft)

Structural · During Construction

Inspection covers probe IDs, temperature curves, approved limits and deviations.

4 available documentsMSCHKITP
ACT-037

Concrete Pumping Works

Structural · During Construction

Inspection covers line inspection, restraint, approved setup and washout disposal.

4 available documentsMSCHKITP
ACT-038

Hot Weather Concreting

Structural · During Construction

Inspection covers ambient and load temperature, elapsed time and rejection evidence.

4 available documentsMSCHKITP
ACT-039

Concrete Curing

Structural · During Construction

Inspection covers timing, coverage, interruptions and curing release.

4 available documentsMSCHKITP
ACT-040

Construction Joints and Waterstops

Structural · During Construction

Inspection covers location, splice integrity and photos on both faces.

4 available documentsMSCHKITP
ACT-041

Post-Tensioned Slabs

Structural · During Construction

Inspection covers tendon IDs, elongation, jack calibration and closure evidence.

4 available documentsMSCHKITP
ACT-042

Precast Concrete Elements Installation

Structural · During Construction

Inspection covers piece marks, bearing length, restraint and connection evidence.

4 available documentsMSCHKITP
ACT-043

Hollow Core Slab Installation

Structural · During Construction

Inspection covers seat lengths, unit damage and opening restrictions.

4 available documentsMSCHKITP
ACT-044

Concrete Repair Works

Structural · During Construction

Inspection covers depth and extent, materials and verification results.

4 available documentsMSCHKITP
ACT-045

Core Drilling and Coring Tests

Structural · During Construction

Inspection covers scan, orientation, custody, lab results and repair.

4 available documentsMSCHKITP
ACT-046

Embedded Items and Sleeves Installation

Structural · During Construction

Inspection covers coordinates, level, rotation and rebar clearance.

4 available documentsMSCHKITP
ACT-047

Staircase Construction

Structural · During Construction

Inspection covers rise, going, landings and edge protection.

4 available documentsMSCHKITP
ACT-048

Shear Walls and Lift Cores

Structural · During Construction

Inspection covers core verticality, shaft dimensions and embedded brackets.

4 available documentsMSCHKITP
ACT-049

Water Tanks (Concrete) Construction

Structural · During Construction

Inspection covers joint continuity, level observations and leak disposition.

4 available documentsMSCHKITP
ACT-050

Formwork Striking and Removal

Structural · During Construction

Inspection covers strength evidence, time, retained support and condition.