Plumbing & DrainageActivities: 11
ACT-108

Water Supply Piping (PPR / Copper / GI)

Plumbing · During Construction

Inspection covers material and joint logs, pressure test and disinfection release.

4 available documentsMSCHKITP
ACT-109

Drainage and Soil Piping (uPVC / HDPE / Cast Iron)

Plumbing · During Construction

Inspection covers invert levels, access and flow or water test.

4 available documentsMSCHKITP
ACT-110

Storm Water Drainage

Plumbing · During Construction

Inspection covers outlet ID, endpoint, ponding and leakage.

5 available documentsTESTMSCHK
ACT-111

Underground Drainage and Manholes

Plumbing · During Construction

Inspection covers level survey, cover class, CCTV or testing and backfill clearance.

4 available documentsMSCHKITP
ACT-112

Water Pumps and Booster Sets

Plumbing · During Construction

Inspection covers approved settings, staging, duty and leaks.

4 available documentsMSCHKITP
ACT-113

Water Tanks (GRP / Steel) Installation

Plumbing · During Construction

Inspection covers panel or weld checks, seals, retention and water approvals.

4 available documentsMSCHKITP
ACT-114

Water Heaters Installation

Plumbing · During Construction

Inspection covers tag, relief path, leakage and approved settings.

4 available documentsMSCHKITP
ACT-115

Grease Traps and Interceptors

Plumbing · During Construction

Inspection covers flow direction, cover rating, vents and leakage.

4 available documentsMSCHKITP
ACT-116

Pressure Testing of Water Piping

Plumbing · During Construction

Inspection covers medium, approved pressure and duration, readings and retest.

4 available documentsMSCHKITP
ACT-117

Drainage Water Test / Flow Test

Plumbing · During Construction

Inspection covers water head or flow, leakage, drain time and retest.

4 available documentsMSCHKITP
ACT-118

Disinfection and Flushing of Water System

Plumbing · During Construction

Inspection covers treatment record, sample ID, analytical results and service release.