Construction documents
Activity library
Choose a work package or filter by discipline and project phase to find the records you need to plan, inspect and hand over the work.
11 activities
Search the document libraryPlumbing & DrainageActivities: 11
Water Supply Piping (PPR / Copper / GI)
Plumbing · During Construction
Inspection covers material and joint logs, pressure test and disinfection release.
Drainage and Soil Piping (uPVC / HDPE / Cast Iron)
Plumbing · During Construction
Inspection covers invert levels, access and flow or water test.
Storm Water Drainage
Plumbing · During Construction
Inspection covers outlet ID, endpoint, ponding and leakage.
Underground Drainage and Manholes
Plumbing · During Construction
Inspection covers level survey, cover class, CCTV or testing and backfill clearance.
Water Pumps and Booster Sets
Plumbing · During Construction
Inspection covers approved settings, staging, duty and leaks.
Water Tanks (GRP / Steel) Installation
Plumbing · During Construction
Inspection covers panel or weld checks, seals, retention and water approvals.
Water Heaters Installation
Plumbing · During Construction
Inspection covers tag, relief path, leakage and approved settings.
Grease Traps and Interceptors
Plumbing · During Construction
Inspection covers flow direction, cover rating, vents and leakage.
Pressure Testing of Water Piping
Plumbing · During Construction
Inspection covers medium, approved pressure and duration, readings and retest.
Drainage Water Test / Flow Test
Plumbing · During Construction
Inspection covers water head or flow, leakage, drain time and retest.
Disinfection and Flushing of Water System
Plumbing · During Construction
Inspection covers treatment record, sample ID, analytical results and service release.